Sewer Pipe Main Rehabilitation
Engineering Office
Sewer Pipe Main Rehabilitation
Sewer Pipe Main Rehabilitation
Our upcoming Engineering projects will consist mainly of Sewer Pipe Main Rehabilitation using a Cured-in-Place Lining process. Cured-in-Place Lining is a process that uses a textile liner tube that has been filled with a liquid resin and is pulled through a sewer main, then expanded and cured using hot water or steam. When the liner has been cured it takes on the shape of the existing main it was pulled through and helps to prevent any future water or root infiltration.
|
Engineering Office
|
Please feel free to call us with your questions or concerns:
|
Weather observations:
Readings are recorded at 7 a.m. every day and reflect the previous 24-hour period between 7AM yesterday and 7AM today.
High (°F) |
Low (°F) |
Precipitation (in.) |
River Level at Highland Bridge (ft.) |
42 |
30 |
0.0 |
1.11 |
1540 n. washington st.
|