Setting and dropping of a manhole base.

Safety box which is placed in the excavation hole to protect the workers.

The safety box after it is placed in the trench.

Hand excavation under a 60" combined sewer pipe.

Micro tunneling drill in operation at the excavation site.

Fresh drill head with carbide tips on a micro tunneling shaft.

Micro tunneling shaft drill head after use.

                